When it comes to commercial applications "NON POTABLE" water can be required for a number of reasons. It could be for a back-up supply, a toilet block, on building sites or to cover showering requirements.
Irrespective of the ‘why’, the ‘how’ should be simple. For large and small projects this water needs to be delivered according to some vital parameters.
Accuracy. It needs to be the right quantity. When dealing with large amounts cost effectiveness comes through accuracy. We can correctly assess what will be needed pre-delivery and, if demand changes, can be back on site quickly.
Reliability. It needs to be delivered on time. Big projects cannot be stopped and started on a whim. We pride ourselves on a quick, responsive service, and will do everything in our power to ensure water is there when you need it.
#####ONLY WAIMAK/SELWYN AREAS ONLY BY PERMIT####